World Bank GroupWorld Bank Group
Syr Darya Control & Northern Aral Sea Phase I Project 
 
The Syr Darya Control and Northern Aral Sea (NAS) Phase I Project, seeks to sustain, and increase agriculture, and fish production in the Syr Darya basin, and secure the NAS existence, by improving ecological and environmental conditions in the delta area. Project components include: 1) restoration of the NAS area, through the construction of a closure dike in the Bering Strait, a channel connecting the NAS, and the larger southern Aral Sea (LAS), and, conveying additional flows into the NAS. Current excessive spills will be diverted into the Arnasai depression into the Syr Darya river, to reduce river losses by the construction of flood protection dikes. Major obstructions to river flows between the Chardarah dam and the NAS will be removed, to straighten the river at three locations; 2) improvements on the hydraulic control of the Syr Darya, through an increased capacity of the Syr Darya entity, and diverting downstream flows towards the delta ecosystem to further restore the NAS. Major water infrastructure will be rehabilitated on the Syr Darya and Karaozek branch, to improve irrigated areas, lakes, and hayfields in the basin, while river bed erosion resulting from receding sea water levels will also be improved, through the installation of weirs at Aklak, and hydraulic works for delta lakes, and wetland ecosystems; 3) rehabilitation of the Chardarah dam, through the financing of a first phase program, provided the dam embankment stability is ensured, and additional geo-technical research, and, further hydrological research are undertaken; 4) aquatic resources restoration, and fisheries development through detailed preparation, and implementation phases, anticipating technical assistance, policy reforms, and a new cooperative trading organization, in addition to co-financing possibilities; and, 5) monitoring and evaluation will be provided, and, project management, and institutional development will be supported.** 
  Last Updated  July 17 2009
Basic Information
Project StatusActive 
Region Europe And Central Asia 
Country/AreaKazakhstan 
Major Sector (Sector) (%) Agriculture, fishing, and forestry (Irrigation and drainage) (66%) 
  Water, sanitation and flood protection (Flood protection) (29%) 
  Public Administration, Law, and Justice (Central government administration) (4%) 
  Agriculture, fishing, and forestry (Animal production) (1%) 
Old Major Sector Agriculture  
Old Sector Irrigation & Drainage  
Env CategoryA  
Project IDP046045 
Bank Team Lead (Last Name, First)Stoutjesdijk, Joop  
Approval Date05-JUN-2001  
Closing Date31-DEC-2009  
BorrowerREPUBLIC OF KAZAKHSTAN  
Implementing AgencyMINISTRY OF NATURAL RESOURCES & ENVIRONMENTAL PROTECTION  

Financial
Main Loan/Credit #46090  
IBRD Commitment *64.5 
IDA Commitment *
IBRD + IDA Commitment *64.5 
Grant Amount *
Total Project Cost *85.79 
Product LineIBRD/IDA 
Lending InstrumentSpecific Investment Loan 

Development Outcomes And Goals
Targeted Thematic Outcomes...Supporting this Broader Dev't Goal
BiodiversityEnsure environmental sustainability (MDG); Environmental commons (GPG)
Water resource managementEnsure environmental sustainability (MDG); Environmental commons (GPG)
Infrastructure services for private sector developmentN/A (CAP)
Rural services and infrastructureN/A (CAP)
Available Project Documents***
For a short project overview, please consult the Project Information Document if available.
 
Loan Agreement (), Vol. -22-OCT-2001 
Project Information Document (PID), Vol.1 -31-MAY-2001 
Project Appraisal Document (PAD), Vol.1 -11-MAY-2001 
Environmental Assessment (EA), Vol.1 -30-NOV-2000 
Environmental Assessment (EA), Vol.2 -30-NOV-2000 
Project Information Document (PID), Vol.1 -05-SEP-1997 
 
Contract Award Information
 
Click here to see contract award information about this project.

*Commitment at Board in USD$ millions. Does not reflect any cancellations. Pipeline and dropped projects display the forecast amount. Total project cost includes non-Bank funding.

** The project summary is drawn from the PAD, SAR, or PGD abstract and may not accurately reflect the project's current nature.

*** Project documents are posted to this website as soon as they reach certain milestones (more info.). For example, Project Appraisal Documents are processed and made available through this website a few days after Board approval. If you find that a report which should be here is unavailable, contact Infoshop .