|
|
|
 |
 |
| Syr Darya Control & Northern Aral Sea Phase I Project
|
|
| |
|
|
The Syr Darya Control and Northern Aral Sea (NAS) Phase I Project, seeks to sustain, and increase agriculture, and fish production in the Syr Darya basin, and secure the NAS existence, by improving ecological and environmental conditions in the delta area. Project components include: 1) restoration of the NAS area, through the construction of a closure dike in the Bering Strait, a channel connecting the NAS, and the larger southern Aral Sea (LAS), and, conveying additional flows into the NAS. Current excessive spills will be diverted into the Arnasai depression into the Syr Darya river, to reduce river losses by the construction of flood protection dikes. Major obstructions to river flows between the Chardarah dam and the NAS will be removed, to straighten the river at three locations; 2) improvements on the hydraulic control of the Syr Darya, through an increased capacity of the Syr Darya entity, and diverting downstream flows towards the delta ecosystem to further restore the NAS. Major water infrastructure will be rehabilitated on the Syr Darya and Karaozek branch, to improve irrigated areas, lakes, and hayfields in the basin, while river bed erosion resulting from receding sea water levels will also be improved, through the installation of weirs at Aklak, and hydraulic works for delta lakes, and wetland ecosystems; 3) rehabilitation of the Chardarah dam, through the financing of a first phase program, provided the dam embankment stability is ensured, and additional geo-technical research, and, further hydrological research are undertaken; 4) aquatic resources restoration, and fisheries development through detailed preparation, and implementation phases, anticipating technical assistance, policy reforms, and a new cooperative trading organization, in addition to co-financing possibilities; and, 5) monitoring and evaluation will be provided, and, project management, and institutional development will be supported.**
|
 |
 |
 |
 |
|
| |
Last Updated July 17 2009
|  |
Available Project Documents***
For a short project overview, please consult the Project Information Document if available.
|
 |
| |
|
|
| |
 |
 |
 |
| Contract Award Information |
 |
| |
| Click here to see contract award information about this project. |
|
|
*Commitment at Board in USD$ millions. Does not reflect any cancellations. Pipeline and dropped projects display the forecast amount. Total project cost includes non-Bank funding.
** The project summary is drawn from the PAD, SAR, or PGD abstract and may not accurately reflect the project's current nature.
*** Project documents are posted to this website as soon as they reach certain milestones (more info.). For example, Project Appraisal Documents are processed and made available through this website a few days after Board approval. If you find that a report which should be here is unavailable, contact Infoshop .
|
|
|
|