Kazakhstan - Syr Darya Control and Northern Aral Sea (Phase I) Project
 
Bus Process:A.1.c. AppraisalCountry:Kazakhstan ; 
Doc Cat:BANK REPORTSDocument Date:2001/05/11
Doc Name:Kazakhstan - Syr Darya Control and Northern Aral Sea (Phase I) ProjectDocument Type:Project Appraisal Document
Language:EnglishLoan No:4609 ; P371
Major Sector:Agriculture, fishing, and forestryOriginating Unit:Sustainable Devmt Sector Unit (ECSSD)
Rel. Proj ID:KZ-Syr Darya Control & Northern Aral Sea Phase I Project -- P046045 ; Region:Europe and Central Asia
Rep Title:Kazakhstan - Syr Darya Control and Northern Aral Sea (Phase I) ProjectReport Number:22190
Sector:Central government administration ; Animal production ; Irrigation and drainage ; Flood protectionSubTopics:Water Conservation ; Town Water Supply and Sanitation ; Water and Industry ; Water Supply and Sanitation Governance and Institutions ; Drought Management
Topics:Water ResourcesTF No/Name:TF039662-KAZAKHSTAN - SYR DARYA CONTROL AND NORTHERN ARAL SEA PROJECT ; TF033222-EASTERN EUROPE REGION - IRRIGATION AND DRAINAGE PROJECTS ; TF027108-PHRD-SYR DARYA HYDRAULIC CONTROL PRJECT ; TF025236-PHRD-ECOL.RESTORA.ARAL SEA NORTH BAY ; TF034812-ECA REGION - IRRIGATION PROJECTS (KRYGYZ REP.,KAZAKSTAN, ; TF039909-KAZAKHSTAN - SYR DARYA CONTROL AND NORTHERN ARAL SEA PROJECT ; TF038461-KAZAKHSTAN: SYR DARYA
Unit Owning:Sustainable Devmt Sector Unit (ECSSD)Volume No:1

Abstract: The Syr Darya Control and Northern Aral Sea (NAS) Phase I Project, seeks to sustain, and increase agriculture, and fish production in the Syr Darya basin, and secure the NAS existence, by improving ecological and environmental conditions in the delta area. Project components include: 1) restoration of the NAS area, through the construction of a closure dike in the Bering Strait, a channel connecting the NAS, and the larger southern Aral Sea (LAS), and, conveying additional flows into the NAS. Current excessive spills will be diverted into the Arnasai depression into the Syr Darya river, to reduce river losses by the construction of flood protection dikes. Major obstructions to river flows between the Chardarah dam and the NAS will be removed, to straighten the river at three locations; 2) improvements on the hydraulic control of the Syr Darya, through an increased capacity of the Syr Darya entity, and diverting downstream flows towards the delta ecosystem to further restore the NAS. Major water infrastructure will be rehabilitated on the Syr Darya and Karaozek branch, to improve irrigated areas, lakes, and hayfields in the basin, while river bed erosion resulting from receding sea water levels will also be improved, through the installation of weirs at Aklak, and hydraulic works for delta lakes, and wetland ecosystems; 3) rehabilitation of the Chardarah dam, through the financing of a first phase program, provided the dam embankment stability is ensured, and additional geo-technical research, and, further hydrological research are undertaken; 4) aquatic resources restoration, and fisheries development through detailed preparation, and implementation phases, anticipating technical assistance, policy reforms, and a new cooperative trading organization, in addition to co-financing possibilities; and, 5) monitoring and evaluation will be provided, and, project management, and institutional development will be supported.
Expand / CollapseKeywords:

Official Documents
Official version of document (may contain signatures, etc)
File TypeDescriptionFile Size (mb)
Click here to see PDF filePDF 105 pagesOfficial Version7.35 (approx.)
Click here to see text fileTextText Version*
How To Order

See documents related to this project
*The text version is uncorrected OCR text and is included solely to benefit users with slow connectivity.

Home  |  Site Map  |  Index  |  FAQs  |  Search  |   
© The World Bank Group, All Rights Reserved. Legal.